Thursday, March 8, 2012

Hardware installed

 


We continued on with the painting, not quite getting as far as we had hoped, though we will be done with everything except the basement by the end of this weekend.  I set up the doors in the garage in an arcade so I could spray paint them.  It took several coats of paint, but the end result is terrific.   






 




Installing the doors required all of the door jambs be painted, so we spent last weekend making sure that the door frames were ready.  I re-installed all of the doors, and installed the lever sets and door bumps.  

One of the great design features of a barrier free home is a lever handle on the door.  We found a nice arts and crafts lever set from Emtek. Slightly more challenging was the hardware for the double pocket doors, but I finally found a mortise privacy lock that will work just fine, also from Emtek. 








 


I was able to get a coat of stain on the maple doors in the living room.  We had determined that we wanted the stain to match the kitchen cabinets.  We came pretty close, just a slight shade lighter.  A coat of clear sealer has darkened it just a fraction.   





This weekend we will finish painting the rest of the baseboard and garage, and we will be ready to remove the protective paper from the floor.  Then we start vacuuming and moping in anticipation of applying the final sealer.  This may be a two weekend project, and I expect that we will have to vacate the building for a day or two while the concrete sealer cures.






I have a few more carpentry projects to finish up.  The countertop for the island needs to be finish sanded, the backsplashes for the bathrooms and laundry room need to be fabricated, I need to make my new desk top, and I have a little bit of trim remaining to do on the outside of the house.  

I will schedule the final inspection early next week.  With time to spare on the schedule we have plenty of opportunity to make sure that all of the little details are complete before we move in.  Adjusting doors, securing appliances, painting the basement, and other low priority tasks can be finished up before we move in by the end of the month. 


We are looking forward to that date if only for a brief reprieve.  We have allowed ourselves a weekend off after we move in before we begin tackling the exterior spring completion work. 

Thursday, March 1, 2012

The End is Near

We have completed the mechanical, electrical, and plumbing, and should have all of those inspections done this week.  I finished painting the closets and installed the closet shelving in the pantry, front hall closet, and master bedroom.












We finished painting all of the walls over the weekend so that the electrical outlets and light fixtures could be installed. It is really nice to have access to light and power now without having to stretch and extension chord the length of the house. 

 
The lights are all of a craftsman style and are Energy Star certified which makes them among the top 25% of the top performing light fixtures in energy efficiency.  The under cabinet lighting is a ribbon of light emitting diodes (LED) about 1/8" thick, and about 3/8" wide.  It comes on a spool which can be cut to length with a pair of scissors in about 2" increments.  We had selected the color to simulate daylight to match all of the other lamps (the technical term for light bulbs) in the house.  Though we went to some trouble to get all of the lamps to match, the lens that it shines through, and the paint that it reflects off of have an impact on the color of the light. 

All of our lamps are either LED or compact fluorescent lamps (CFL's) in an effort to minimize energy consumption, and reduce the amount of Photovoltaic panels we will require.  Every appliance in the home is Energy Star rated for the same reason.  We have opted out of having a garbage disposal to reduce the demand for power, water, and the impact on the septic system, and will compost food scraps instead.  We have opted to make some lifestyle changes, and will keep you posted on how well we are adapting.  More on that later. 



 

This weekend we will finish painting the trim, and start painting the doors.  As soon as that is complete, we can re-install the doors and hardware, remove the paper and plastic from the floor, and prep the floors for the final coat of sealer.  We still want to finish painting the basement and the garage before we move in, but neither is a priority. 

When we are done with this phase of work, we will call for the final inspection.  We will get a temporary occupancy permit which will allow us to live in the house until the exterior work is complete.  The cement stucco, trim, painting, stormwater collection system, final grading, and landscaping will need to be completed in order to get the final occupancy permit. 

Thursday, February 23, 2012

Trim done and painted ... mostly

 
The extended family joined us over a long weekend, and we were able to get a good share of the painting done.  Our three kids Jake, Becky, and Rachael, joined us from Northern Michigan, California, and Ohio, and Judy's brother Dave and wife Cheryl joined us from Iowa and rounded out the crew. We painted most of the trim, most of the walls, and got the feature wall colors painted.  We were really pleased with the colors which were selected for us by Rachael based on the some of our favorite art pieces. 




 




 
The trim was completed this week, with the most complicated part being the installation of the huge pocket doors and the sliding doors in the living room.  They are very heavy and required two people to set in place.  The wood doors will be stained a honey maple to match the cabinets.  




 

The rolling doors in the living room provide architectural relief from a conventional door in our main living area.  These doors to the front hall closet and pantry glide on an overhead rail with exposed wheels.  The doors will be stained to match the cabinets and will become a backdrop for artwork.  




  
 
 


A few more hours tomorrow will have the countertops ready for the plumber.  He will complete the installation of the three remaining sinks, dishwasher, refrigerator ice maker, and the sump pump and be ready for the final inspection.  

The bath accessories are all installed with the exception of the shower rods, for which I have not found a suitable rod.
 
The HVAC is nearly complete.  Today they installed the registers, thermostats, outside air filter box, exhaust fan controls, and some final wiring.  A few more details to clean up tomorrow and it will be ready for final inspection.  



Monday the electrician will begin the final electrical.  I have already started installing the light fixtures per our agreement.  They will install the outlets, switches, and a couple of fan controls and should be ready to call for their final inspection by the end of the day Tuesday.  
   
There is still a great deal to be done.  Closet shelving, painting the basement and garage, backsplashes in the bathrooms and kitchen, undercabinet lighting, cabinet hardware, cleaning, and final sealing of the floor are but a few of the many details that will take another couple of weeks to complete. 

Thursday, February 16, 2012

Trim and Paint

What a difference a week makes.  My paint estimates were woefully inadequate.  I purchased a spray rig to enhance productivity, however it also consumes more paint than rolling it on.  In any case we are very pleased with the results though we made several extra trips to the store for more paint.  We were able to get all of the walls primed, and all of the closets and ceilings final painted.




The doors arrived and were damaged in an unfortunate incident where the truck driver moved the truck without securing the doors.  Half of the order fell over and was damaged.  The driver felt horrible, but his team at Standale Lumber had his back.  The replacement door jambs were re-fabricated by Monday morning and we did not lose any production time.  


I was able to get all of the cabinets installed ahead of the trim carpenter.  Some of the cabinets line the exterior wall where we had problems with the moisture in the insulation.  NuWool (the insulation manufacturer) technical advisers indicated that the moisture would continue to migrate through the wall to the interior for at least the next six to nine months based on the amount of insulation we installed.  The moisture migration could delaminate any plywood backing on the cabinets, and create issues with the subway tile backsplash we intend to install.  After many abandoned concepts, I drilled one inch holes at the top and bottom of the cabinets every 12" on center and installed a little plastic vent (the three black dots in the back of the cabinet) in the hopes that any moisture will find its way out through these vents.  As for the backsplash, we will wait until this fall to install it. 

 


The trim was substantially completed this week and is ready for us to fill nail holes, caulk and paint.  We have a full complement of family coming for a long weekend to help with the project, and are looking forward to a fun and productive work session.  

We received the solid surface counter top material.  I found a supplier (solidsurface.com) that will supply manufacturer's seconds. The truck driver did a masterful job of getting it back to the house on a slippery curving driveway.  We unloaded the 600 lb crate with a lot of huffing a puffing, but managed to unload everything intact.   I really like working with this material.  We selected Corian Glacier White for the kitchen counters, and Shale for the window sills.  I rough cut the kitchen counters, and my daughter Becky helped me rough cut the window sills. 



We are using Formica for the bathrooms and laundry room.  Becky and I were able to fabricate the Formica countertops and set three of them with the fourth ready to assemble.  The garage exhaust fan that we installed to evacuate carbon monoxide did a fantastic job of containing the fumes from the contact cement used in adhering the plastic laminate to the countertop substrate.










Our plumber installed all of the water shut off valves, the toilets, and the laundry room sink.  We are expecting that some of the family contingent will camp out at the house this weekend, and were trying to keep them from having to make the long trek (35 feet) through the wilderness.  See Arctic Loo and Post Arctic Loo photos below.   























We have moved all of the light fixtures, plumbing fixtures, and toilet accessories out to the new house from our spare bedroom freeing up more space to dust and clean in the apartment. 

Over the next week we will finish the trim, the countertops, and begin the final hookups for t
The mechanical, electrical, and plumbing contractors.  We should be about 80% complete with the painting by the end of this weekend with the big family work crew.  The remaining areas including the basement and garage are not high priorities, but we will want to complete them before we move in.  

Thursday, February 9, 2012

Priming the drywall

Not a lot of activity this week.  This is no reflection on the drywall crew who worked very hard.  They just took up a lot of the schedule, finishing up yesterday. 

I started priming the drywall in preparation for the installation of the trim.  The paint store was pleased to get an order for 60 gallons of paint which I picked up yesterday.  Kilz makes a Zero VOC primer that I had tinted to match the base color in the house.  The primer has worked really well.  Low odor, very good coverage, and good workability.  Most of the time has been spent masking the floors.  We had covered the windows before the drywall started, and there were only a few tears that required repair.

By the end of the weekend we will have all of the walls primed, the ceilings painted, and the cabinets brought up from the basement.  The carpenters can't install the baseboard until the cabinets are set.  If all goes well, I should have them all set by the end of the day Monday.  As a recovering carpenter, I picked all of the fun jobs for myself.  Setting cabinets is one of my favorite jobs.   


Tomorrow the doors will be delivered, to be installed on Monday.  As soon as they are done, the rest of the trim will be installed, all of which should be complete by the end of the week.  I expect the Corian countertop material to be delivered this coming week.  SolidSurface.com sells factory "Select" solid surface materials from a number of major manufacturers.  Some are from batches that do not meet a manufacturer's color specifications, and some are cut pieces that have a potential life on another project. 

Thursday, February 2, 2012

Drywall continues

 



We spent the weekend assembling cabinets, and now have a basement full.  The assembly was fairly intuitive, which was good since no instructions came with the cabinets.  Fortunately, I am a man, and do not rely on instructions. This never ceases to aggravate my wife. 


Only a few minor issues with the assembly that were easily resolved.  It did become obvious however that I had neglected to accommodate the angled bulkhead in the kitchen for the corner cabinet.  A little quick framing and some help from the drywall crew fixed that in short order. 


 


The drywallers are nearly finished.  They won't be done until the middle of next week, but things are looking great.  They determined that the texture of the fiberglass fabric on the paperless board in the bathrooms was too coarse to just tape the joints, so they opted to skim coat the entire surface to provide a smoother surface. 









 






The exterior trim is nearing completion.  Because the windows and doors are recessed four inches from the surface of the house, the construction of jamb extensions and sills has become a study in patience.  Window sill material historically is angled at about 15 degrees to shed water.  


I had to wait for a special order of cedar to arrive to mill to this profile.  The narrow grove shown on this upside-down piece cut about 3/8" from the front of the sill is a drip edge designed to prevent water from backing up into the building. 

 

 
We took one of our cats out to the house to begin to acclimate as we worked on the cabinets.  She made herself right at home. 

Thursday, January 26, 2012

Drywall is hung



We had a light snowfall last weekend of a few inches.  Judy drove up to the house with the camera just as sections of the roof were shedding.  We have purchased a snow stop to protect the entrance and the driveway from large snow deposits. This is a continuous bar that will run across the main roof, bolting on to the standing seam of the metal roof about a foot above the eave.  However, after watching this display we are considering not installing it.  A self-cleaning roof would allow the photovoltaic panels to be more effective.  The occasional shoveling to get out of the garage is the price we would pay to have the electricity on on the winter.    

I did spend some time calculating where the snow would accumulate when I designed the sidewalk.  The first snow shedding event dumped right on the sidewalk, and the second one cleared it easily.  Guess I did not accurately calculate the coefficient of friction for snow.  





I have been working on the exterior trim.  Because the windows have four inches of foam extending beyond where the windows were mounted, we need to install a jamb extension to cover the edge of the foam.  The 2x8 cedar for the window sills arrived today which I began to mill to a custom profile.   



We received the cabinets on three pallets earlier in the week all of which will require assembly.  Judy and I will be working on them evenings and weekends and testing the strength of our marriage vows.  After 34 years, I think we can weather a couple more months of this. 



The big job completed this week was hanging the drywall.  The installers finished in only two days and were amazing to watch.  Not only is hanging drywall hard, heavy work, but the crew worked at it non-stop until they got the job done.  It was a very impressive performance.  



One feature of a LEED home is the requirement to use paperless drywall in the bathrooms.  Paperless drywall uses a fiberglass fabric face in lieu of paper on the back side to prevent mold from obtaining a purchase.  Mold requires two things to get started.  Moisture and food.  The typical drywall paper backer is a source of food for mold. 















The drywall finishers expect to be done by the end of next week.  I will continue working on the exterior trim, and we will be working on assembling the cabinets over the next several weeks.  We will prime all of the drywall before we start the trim installation.